| Titulo | Vianova Asphalt Plat120 t/h | | Localización | Reino Unido | | Comentarios | • Via Nova 120 tonnes per hour plant built in 1969 • Ducting from dryer to filter and pre skimmer all replaced Dec 2006 • The rotary dryer drum 1.9m diameter x 9 m. long was replaced in 1998 Oil burner VN1000 9,6 LF • The filter was replaced with a new Enviroflo Model E432/603 reverse air fabric filter dust collection system in 1998 • Three bin Sherwen Engineering hot storage unit of 300 tonnes capacity with skip track and two tonne skip fitted in 1996 The line containes: 5 units Cold feeder, Dryer, Mixing Tower, Silo Filter, Bag House, Hot aggregate elevator, Control Cabin, Conveyers, 3 large Tanks. I attach a photograph of the plant which is in fair condition for its age. The Via Nova plants are very strong and reliable, we regularly achieve monthly plant availability in excess of 98% The plant has produced on average 70,000 tonnes per annum for the last 12 years with only routine maintenance. The burner is very economical using on average 8 litres of gas oil per tonne of stone dryed. Price is as is where is £50,000  |
Este material ya se ha vendido. |
|
Haga clic sobre la foto para aumentarla
  Servicios
  Herramientas |